Back to Build Log 


Wing ribs installed — left wing
Wings- Date
- Jan 25, 2025
- Time Spent
- 4h 30m
Build Writeup
Installed all 12 wing ribs on the left wing, working from root to tip. Clecoed each in position, verified alignment with a laser level, then match-drilled. Completed 8 of 12 ribs today — the last 4 tip ribs will be done next session when I can get help positioning.
Photos (4)




Demo only — data is not saved.