Back to Build Log 
Left wing main spar preparation
Wings- Date
- Jan 18, 2025
- Time Spent
- 2h 30m
Build Writeup
Deburred all holes in the left wing main spar caps and web. Applied two coats of Akzo epoxy primer to the interior surfaces. Allowed to cure 24 hours per manufacturer spec. Spar is ready for rib installation.
Photos (2)


Demo only — data is not saved.