Forward bulkhead assembly complete
Fuselage- Date
- Feb 22, 2025
- Time Spent
- 1h 45m
Build Writeup
Installed and riveted the forward bulkhead assembly (F-706). All AN470AD4-5 rivets driven with no driven-head defects. Checked squareness against reference lines — within 1/32". Also installed nutplates for firewall attachment bolts.