DEMO Interactive preview — sample data, no account needed.
Sign up free →
Back to Build Log

Forward bulkhead assembly complete

Fuselage
Date
Feb 22, 2025
Time Spent
1h 45m

Build Writeup

Installed and riveted the forward bulkhead assembly (F-706). All AN470AD4-5 rivets driven with no driven-head defects. Checked squareness against reference lines — within 1/32". Also installed nutplates for firewall attachment bolts.

Photos (2)

Build photoBuild photo

Demo only — data is not saved.