Main gear legs fitted

Landing Gear
Date
Feb 28, 2025
Time Spent
2h 45m

Build Writeup

Fitted both main gear legs into the fuselage gear tower. Had to elongate the right-side aft hole by about 0.015" to achieve correct alignment. Both legs torqued to spec. Wheel pants mounting brackets installed at correct cant angle per the plans.