Main gear legs fitted
Landing Gear- Date
- Feb 28, 2025
- Time Spent
- 2h 45m
Build Writeup
Fitted both main gear legs into the fuselage gear tower. Had to elongate the right-side aft hole by about 0.015" to achieve correct alignment. Both legs torqued to spec. Wheel pants mounting brackets installed at correct cant angle per the plans.
Photos (2)