Back to Build Log 

Fuselage sides joined at keel
Fuselage- Date
- Feb 15, 2025
- Time Spent
- 3h 30m
Build Writeup
Completed joining the left and right fuselage side skins at the keel center section. Used approximately 80 clecos for alignment before final drilling. All holes match-drilled to #30, deburred, and ready for dimpling. The fit is excellent with no gaps along the keel line. Torqued all temporary bolts per the plans spec.
Photos (3)



Demo only — data is not saved.