DEMO Interactive preview — sample data, no account needed.
Sign up free →
Style: modern · Demo Build Log
← Back

Experimental Aircraft

Demo Build

Build Log

KitplaneBuildLogs

Total Hours

38h 15m

Log Entries

11

Build Sections

5

Generated

Mar 11, 2026

Build SectionEntriesBuild Time
Fuselage310 hr 45 min
Wings310 hr 15 min
Electrical27 hr
Engine / FWF27 hr 30 min
Landing Gear12 hr 45 min
Total1138h 15m
Fuselage 3 entries · 10 hr 45 min

Aft fuselage bottom skins riveted

Mar 1, 2025 5 hr 30 min

Completed riveting the aft bottom skins from station 150 to tail. 312 rivets total — had one set that needed drilling out and re-driving. All shop heads within spec. Finished the session by priming the interior before closing up permanently.

Build photoBuild photoBuild photoBuild photo

Forward bulkhead assembly complete

Feb 22, 2025 1 hr 45 min

Installed and riveted the forward bulkhead assembly (F-706). All AN470AD4-5 rivets driven with no driven-head defects. Checked squareness against reference lines — within 1/32". Also installed nutplates for firewall attachment bolts.

Build photoBuild photo

Fuselage sides joined at keel

Feb 15, 2025 3 hr 30 min

Completed joining the left and right fuselage side skins at the keel center section. Used approximately 80 clecos for alignment before final drilling. All holes match-drilled to #30, deburred, and ready for dimpling. The fit is excellent with no gaps along the keel line. Torqued all temporary bolts per the plans spec.

Build photoBuild photoBuild photo
Wings 3 entries · 10 hr 15 min

Right wing leading edge skins

Feb 8, 2025 3 hr 15 min

Fitted and match-drilled the three leading edge skin sections on the right wing. All holes #40 pilot drilled, then opened to final #30 size. Edges rounded with a file and scotchbrite. The inboard skin required a small adjustment shim at the root — documented with photos.

Build photoBuild photoBuild photo

Wing ribs installed — left wing

Jan 25, 2025 4 hr 30 min

Installed all 12 wing ribs on the left wing, working from root to tip. Clecoed each in position, verified alignment with a laser level, then match-drilled. Completed 8 of 12 ribs today — the last 4 tip ribs will be done next session when I can get help positioning.

Build photoBuild photoBuild photoBuild photo

Left wing main spar preparation

Jan 18, 2025 2 hr 30 min

Deburred all holes in the left wing main spar caps and web. Applied two coats of Akzo epoxy primer to the interior surfaces. Allowed to cure 24 hours per manufacturer spec. Spar is ready for rib installation.

Build photoBuild photo
Electrical 2 entries · 7 hr

Avionics tray and radio stack installed

Feb 20, 2025 4 hr

Mounted the Garmin G3X avionics tray and completed the initial wiring for the GDU 460 display. Pinned the D-sub connectors for the ADAHRS and engine monitoring wires. CAN bus terminated with proper 120-ohm termination resistors at each end. System powered up successfully — display shows startup screen.

Build photoBuild photoBuild photo

Main bus wiring harness routed

Feb 12, 2025 3 hr

Ran the main power bus from the battery contactor to the firewall feedthrough. Used 2 AWG welding cable for the main bus run. All connections made with ring terminals, torqued to 25 in-lb and covered with self-amalgamating tape. Ground strap from engine mount to firewall torqued to 35 in-lb.

Build photoBuild photo
Engine / FWF 2 entries · 7 hr 30 min

Lycoming IO-360 engine hung

Mar 5, 2025 3 hr 30 min

Major milestone — engine is on the airframe! Used a hoist and a helper. All four mount isolators installed in the correct orientation (soft side toward the mount). Prop flange torque checked. Throttle and mixture cable routing planned for next session. Took about 3 hours total including safety.

Build photoBuild photoBuild photoBuild photo

Engine mount fitted and drilled

Feb 5, 2025 4 hr

Fitted the Vetterman exhaust-compatible engine mount to the firewall. All 4 through-bolts installed with AN960-716 washers and elastic stop nuts. Torqued to 160 in-lb per the mount manufacturer spec. Verified clearance from all four sides — minimum 1.5" on all surfaces. Ready for engine installation.

Build photoBuild photo
Landing Gear 1 entries · 2 hr 45 min

Main gear legs fitted

Feb 28, 2025 2 hr 45 min

Fitted both main gear legs into the fuselage gear tower. Had to elongate the right-side aft hole by about 0.015" to achieve correct alignment. Both legs torqued to spec. Wheel pants mounting brackets installed at correct cant angle per the plans.

Build photoBuild photo
Demo Build · KitplaneBuildLogs.com March 11, 2026